Fuze

Guide / Fuze MCP

Review a proposed table from Claude.

A proposed table and a saved supplier are different things. Here’s how to tell which one Claude has handed back.

Find the proposal in Approvals.

In our demo, Claude drafted a table for supplier contracts and renewal dates. The Approvals view in the chat showed a request marked Needs input. At that point the table didn’t exist. Opening the request in Fuze let the reviewer check what would change.

Compare the draft with the supplier directory.

Ask Claude to show the existing Supplier table in Data Studio. In the demo, the draft used a text field for the supplier name even though Fuze already had a supplier directory. That’s a reason to ask for a link to the directory before approving the draft.

Check a saved record in its own right.

Adding a supplier to an existing table isn’t the same as changing the table. With permission to add records, Claude saved a demo supplier with 30-day payment terms. The supplier appeared in Fuze and its activity said Created by agent. The separate contracts-table proposal was still pending.